“The works have involved optimising the Heating, Ventilation and Air Conditioning systems which have resulted in Year on Year savings of 25% off the electric cost and 50% off gas, whilst maintaining occupant comfort.

This is great news for Heathrow as it continues to reduce operational costs and reduce energy consumption to work towards the annual and 2020 CO2 reduction target.”
Stuart Smith, Utilities Performance
Manager, Engineering, Heathrow Airport

Download Case Study

Back

© Copyright - BMSI